July 25, 2014 -Commenced drilling operations
August 7, 2014 -Vertical well drilled to a total depth of 6,350 feet (1935.8 meters)to test the Strawn Sands, Caddo Lime, Marble Falls, Barnet Shale, and Ellenberger
October 2014 -Placed in production